Warning: include(/home/content/t/e/s/tesinc/html/.hcc.thumbs/header.php) [function.include]: failed to open stream: No such file or directory in /home/content/31/5399231/html/index.php on line 13

Warning: include() [function.include]: Failed opening '/home/content/t/e/s/tesinc/html/.hcc.thumbs/header.php' for inclusion (include_path='.:/usr/local/php5/lib/php') in /home/content/31/5399231/html/index.php on line 13

Warning: include(/home/content/t/e/s/tesinc/html/administrator/modules/mod_feed/view.php) [function.include]: failed to open stream: No such file or directory in /home/content/31/5399231/html/index.php on line 16

Warning: include() [function.include]: Failed opening '/home/content/t/e/s/tesinc/html/administrator/modules/mod_feed/view.php' for inclusion (include_path='.:/usr/local/php5/lib/php') in /home/content/31/5399231/html/index.php on line 16

Warning: session_start() [function.session-start]: Cannot send session cookie - headers already sent by (output started at /home/content/31/5399231/html/index.php:13) in /home/content/31/5399231/html/libraries/joomla/session/session.php on line 423

Warning: session_start() [function.session-start]: Cannot send session cache limiter - headers already sent (output started at /home/content/31/5399231/html/index.php:13) in /home/content/31/5399231/html/libraries/joomla/session/session.php on line 423

Warning: Cannot modify header information - headers already sent by (output started at /home/content/31/5399231/html/index.php:13) in /home/content/31/5399231/html/libraries/joomla/session/session.php on line 426
Engineering

Engineering

 
 
  • Engineering, construction, installation and maintenance of telecommunications and cable infrastructure (voice, video and data)
  • Telephony – from the central office through outside plant fiber and copper cabling to the home or office
  • Cable Television – from the head end through outside plant fiber and coaxial cabling to the home
  • Identification and marking of underground telephone, cable, power, gas, water, and sewer utilities prior to excavating by others
  • Minimizes network outages and safeguards the general public from damage to underground utilities
  • Mandated by state statute for all commercial and residential construction sites
  • Feasibility Study & Route Selection
  • Project Management
  • Inspection
  • OSP & Field Engineers / Planning Engineers
  • Scheduling
  • Central Office Equipment Engineering
  • Right of Way Agents / Permitting Agents
  • Transmission Engineering
  • Drafting / Clerical Support
  • Construction Inspection
  • Pole Inspections-Inventories / Surveys
  • Roadway Improvement Plans
  • Manhole Surveys and Conduit Design
  • Fiber-to-the-Cell